Fort Peck Reservation Challenge: Fort Peck generates power for the reservation with an environmentally conscious wind farm project. "We needed a way to control the wind generation towers," said Paul Weyrauch. Solution: Weyrauch's company, Gaffaney's of Williston, Plentywood, and Glasgow, offered the tribe a wirelesss solution that included three rugged D-Link DWL-7700AP access points. "This was the only product we found that could withstand -40 degrees Farenheit," Weyrauch states. See Full Case Study Have you recently completed an install with a D-Link solution? Please contact Tam Vuong in the D-Link Marketing department to discuss a possible case study: tam.vuong@dlink.com |
No comments:
Post a Comment